The U.S. District Court for the Eastern District of Oklahoma is seeking quotes for remodel work within a chambers office space. Work is described as follows:
Kitchen:
- Remove existing countertop and backsplash, replace with new Quartz countertop and 4" back splash.
- Remove existing stove top.
- Remove existing cabinets, replace with new cabinets.
- Remove existing under counter ice maker and refrigerator, replace with matching cabinet doors.
Restroom:
- Remove existing tile countertop, replace with new Quartz countertop and 4" back splash.
- Remove existing sink and faucet, replace with new sink and faucet.
- Remove existing toilet, replace with new toilet.
Office Closet:
- Remove existing tile countertop, replace with new Quartz countertop and 4" back splash.
- Remove existing sink and faucet, cap water line.
Contractor will be responsible for all stages of work as follows:
- Survey: Site surveys shall be requested prior to beginning of renovation.
- Prep: Protect floors, walls, and any objects/furniture within the work area.
- Demo: Removal of existing cabinets, countertops, and tile as described.
- Cabinetry: Installation of new cabinets and hardware in kitchen area.
- Countertops: Installation of new Quartz countertops in all areas with accompanying 4" back splash.
- Plumbing: Installation of drains and necessary water lines/fittings in designated areas. Install sinks and faucets provided by the court.
- Drywall: Repair or install any new drywall as needed in the course of renovation.
- Paint: Apply 1 coat of primer and 2 coats of finish paint in the color designated by the court in all areas specified.
- Clean Up: Removal of all materials, debris, and scrap created during course of renovation. Vacuum carpets, sweep, and mop as necessary to remove dust.
- Repair: Repair any damage caused by workers during the course of renovation.
The court will be responsible for the following:
- Removal of furniture and objects within the work area prior to beginning of renovation.
- Supplying fixtures (sinks, faucets) to be installed by contractor.
All materials and paint colors must be approved by the court prior to installation.
Quotes must be submitted via email to Melanie Kizzia (melanie_kizzia@oked.uscourts.gov).
Quotes must be received by 9/19/2025 to be considered.